VAS will install the first batch atmosphere furnace line in the UK since 2006. The new Ipsen T furnace, is totally water free and with the new HYBRIDCARB generator built in to reduce footprint. The new HYBRIDCARB replaces the old gas generators, resulting in operational savings of up to 98%. The furnaces will be equipped with the latest version of Carbo-prof.
VAS will install and commission the 2 ‘T’ furnaces, temperer, washer and loading equipment at Meltham Thermal Engineers (MTE). Provision is already been made for an additional T furnace in the future.